S10 Muehlviertler Highway
2016-03-29 08:08
by Dürr Group GmbH

S10 Muehlviertler Highway

electro-mechanical equipment

Client: ASFiNAG BMG
Completion: 02/2016
Length: 10,000 m
Tubes: 2

Secure area Freistadt & Urfahr sourroundings

The S10 is one of the most important road projects in Upper Austria. It serves the infrastructural development of the Muehlviertel and is for the districts Freistadt and Urfahr sourroundings very important. The heart of the highway is the 4,4 kilometer tunnel Goetschka. Due to the slope of the terrain it is expanded to three lanes. In March 2013 DÜRR Austria was awarded with the contract and after a construction time of about three years the S10 was opened for traffic.

For better project execution the entire trace of 22 km was devided in four construction stages and six construction lots. The bypass Freistadt with 2 tunnels and 1 UFT was opened for traffic in November 2014, the tunnel Goetschka and Neumarkt and 3 more UFT in the area of Kefermarkt in December 2015.

Project Features

15 UPS units
115 traffic signs
33 info displays
377 escape route lights
2014 LED-lane indicators
39 TNZ cameras
167 emergency roadside telephones
52 speakers & amplifiers
128 local control units
763 km energy cabling & 215 km control cabling
233 km fiber optic cables

0

low voltage distribution boards

0

tunnel lights

0

LED-variable message signs

0

CCTV cameras & AKUT

0

system data points