BAB A 71 Behringen Tunnel
2016-02-27 09:20
by Dürr Group GmbH

BAB A 71 Behringen Tunnel

Retrofitting of safety equipment

Customer: Free State of Thuringia, State Office of Roadbuilding
Completion: 2008
Tunnel length: 465 m
Tube: 2

Services:

Project management, planning, development, documentation, commissioning

Supply and installation services for:

Low voltage main distribution cables, complete energy and control cabling, switching systems, lighting, data logging, CCTV, intercom system, fire alarm system, traffic systems, installation of control centres, tunnel radio system, control centre technology

BAB A 71 Behringen Tunnel
Symbolic: BAB A 71 Behringen Tunnel

Go back

© 2021 DÜRR Group GmbH. All rights reserved.